|
|
| WATERSHED MANAGEMENT
|
|
STREAM CHANNEL
|
| Hydrology Management Methods
|
| Debris Flow Control, Flood Control, Storm Water Control (use of storm drains for runoff), Slope and Erosion Control, Flow Gauge, Stream Mapping
|
| | |
| | |
|
|
HYDROLOGY MANAGEMENT
ACTIVITIES IN WATERSHED
|
| Debris Flow Control
|
| Catch Basin:
Upstream end of Queens culvert - Mosquito Creek (DNV)
|
| Flood Control
|
| Stream Bank Reinforcement:
Rip-rap along stream banks - Mosquito Creek, Thain Creek, Upper Mission Creek (CNV, DNV)
|
| Storm Water Control
|
| Storm Sewer System:
Storm drains empty into streams - Mosquito Creek, Thain Creek, Upper Mission, Lower Mission, Wagg Creek (CNV. DNV)
|
| Slope and Erosion Control
|
|
19th Street east slope (CNV 1995)
u/s Westview culvert (CNV 1999)
Thain Creek Biotech slope (DNV 2000)
Low Level Bridge rip rap (CNV 1998)
|
| Flow Gauge
|
| Water Survey of Canada:
Station No.1: 08GA049
|
| Stream Mapping
|
| Features and Location:
GPS - all streams (DNV 1997)
Features:
measurements, photos - Mosquito Creek, Thain Creek (NSK/MCSS 1997)
Erosion Points:
photos - Mosquito, Wagg, Lower Mission, MacKay Creek (CNV 1998)
| | |
|
|
|